Alteration work
Contents |
[edit] Introduction
A building may need to be altered at some point after it has been constructed during its in-use period. This will necessitate alteration work.
Alteration work may be required for a wide range of reasons, including:
- Factors unforeseeable at the design stage, e.g new efficiency standards become possible.
- Total or partial change of use e.g an office block converted into housing.
- Change of ownership necessitating enlargement, extension or other changes.
- Failure of building components.
- Changing technological possibilities.
- Fashion
- Wear and tear.
Common examples of alterations include:
- Extension.
- Partial demolition.
- Linking or separating spaces.
- Making or closing openings.
- Retrofitting a new component or feature.
- Refurbishing an existing component or feature.
- Renovating an existing component or feature.
- Repairing an existing component or feature.
- Maintenance.
- Decoration.
Alteration work may be instigated by:
- The building owner.
- The building tenant (with the owner’s permission).
- The local authority (e.g if it needs to take urgent action or has instigated a compulsory purchase order).
- Central government (e.g. changes in regulations).
Alteration work can be complex and may involve higher design and construction fees than new build work. Appointing a designer or contractor to carry out the works may be on the basis of a firm that has successfully undertaken work in the past and is trusted by the client/building owner; or by inviting firms to tender for the work in an invitation to tender (ITT).
[edit] Permissions
Some alteration works may require planning permission while some may be considered ‘permitted development’ for which planning permission will not be required. The best way to determine whether a development is ‘permitted’ or not is to refer to the local planning authority.
Examples of permitted development include:
- Certain enlargements or alterations to houses.
- Construction of some sheds and fuel storage containers.
- Certain porches, doors and windows.
For more information see: Permitted development.
Alteration work may also require building regulations approval.
For more information see: Do the building regulations apply to works to existing buildings?
[edit] Variations
The term ‘alteration work’ as used in this article should not be confused with alterations to the scope of works of a construction contract, which are more commonly known as ‘variations’. Variations are changes involving addition, substitution, or omission to the original scope of the construction contract, and can affect the design, quantities, quality, working conditions or sequencing of the works.
For more information see: Variations.
[edit] Related articles on Designing Buildings Wiki
- Building regulations.
- CDM.
- Change of use class.
- Do the building regulations apply to existing buildings?
- Henry Boot Construction Ltd v Alstom Combined Cycles.
- International Existing Building Code (IEBC).
- Material change of use.
- Planning permission.
- Permitted development.
- Refurbishment.
- Renovation.
- Retrofit.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.